Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Fast, Reliable Home Additions & ADU Across Sunset
Adding livable square footage in Sunset means one thing above all else: there’s no raw land left to build on, so nearly every project here is an addition, a conversion, or an ADU tucked onto a lot that already has a house and a septic system on it. We work these unincorporated Miami-Dade lots constantly, from Sunset Park to the streets off Miller Drive, and we know that a county permit and a product approval, not a city hall, decide whether your plan gets built. Our technicians have up to 12 years of experience scoping additions that actually pass inspection. Call (844) 797-9523. We answer 24/7. Fast dispatch from 7am to 7pm, Sunday through Friday.
Why Sunset Homeowners Call Coral Gables Construction for Home Additions & ADU

Sunset is built out. That single fact reshapes every addition project. There’s essentially no undeveloped ground in this ZIP 33173 community, so the work here is a new detached ADU behind a 1950s – 1980s CBS ranch, a room addition over an existing footprint, or a garage that finally becomes something useful. We plan around that reality instead of a clean-slate construction site.
Because Sunset sits in unincorporated Miami-Dade, your permits and inspections run through the Miami-Dade County Building Department, with its own product-approval and wind-mitigation rules. That’s a different desk than a city building department, and we treat it as the governing authority on every Sunset job rather than an afterthought. And why Sunset neighbors call us is simple: one multi-trade contractor handling the addition, the impact windows, the roof, and the hardscaping, so nobody plays phone tag between subs. Call (844) 797-9523 for a free estimate.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Our Home Additions & ADU Services in Sunset
We don’t hand you a single take-it-or-leave-it option. Our home additions & ADU work covers custom builds and vetted prefab and modular systems, so you can weigh square footage, timeline, and budget in the same conversation.
ADU Design & Permitting
Design and permitting are where a Sunset ADU gets won or lost. Every impact window, exterior door, and roofing assembly we specify must carry a current Miami-Dade Product Control NOA, and we confirm that approval before the drawings go anywhere near a permit submittal. Skipping that step is the most common reason a plan sits at the county.

Garage Conversion ADU
An existing garage is the shortest path to rentable or family square footage on a Sunset lot, and it already has a slab and a roof line to work from. Typical garage conversions here run $30,000 – $80,000, and the real cost driver is usually the plumbing and electrical tie-in rather than the finish. We scope that before the price is written.

New Detached ADU
A detached ADU is where Sunset’s septic and well locations start dictating the plan, not the homeowner’s sketch. We survey the tank, drainfield, and well before we fix the building envelope, because those setbacks are what actually define buildable space on these lots. Detached ADU construction typically runs $90,000 – $220,000, with prefab platforms like Abodu and Dvele often shortening the schedule.

Junior ADU & Interior Conversion
Not everyone in Sunset needs a separate structure. A junior ADU or interior conversion carves livable, self-contained space out of existing square footage, which keeps you inside the existing roof and walls. It’s often the most practical route for a multigenerational household or a home office that needs to work as a suite.
Room Additions
A room addition on a Sunset ranch usually means adding onto the same footprint rather than out, because the lot is tight and the setbacks are fixed. We plan the roofline, the impact openings, and the inspection sequence together so the new space reads as part of the house, not a bolted-on box.
Trusted Brands We Service in Sunset
When you bring your addition plans, the materials underneath them matter as much as the layout. Our ADU platform relationships include Abodu, Cover, and Dvele, giving you apples-to-apples prefab options instead of one catalog. On the exterior, impact openings from PGT, CGI, and ECO Window Systems are specified to carry the county product approval the inspection demands. We work with a broad roster of manufacturers across every trade, so you specify by name rather than by category and see how one brand compares against another before you commit. No parts are stocked in a warehouse here; the right material goes on your project by specification.
See the difference
Before
After
Before
After
Before
AfterCommon Home Additions & ADU Problems We See in Sunset Homes
- NOA approval missed on the permit pull. A contractor subs in an impact window or roof assembly approved for another county, and the first Miami-Dade inspection sign-off stalls. We verify the Product Control NOA before the submittal, not after.
- ADU sited before the septic and well survey. On these lots, a detached ADU or shop gets drawn before anyone confirms where the tank, drainfield, and well sit, and the redesign lands as a change order mid-build. We survey first.
- Grading and drainage left off the first scope. An open lot with a new addition needs the runoff planned, or the summer afternoon downpours in South Florida pond against the slab and force rework. We price grading into the initial number.
- Rain and storm-watch shutdowns squeezing the schedule. The May – November hurricane season and heavy summer rain compress workable days, and a plan that ignores them runs long. We build inspection and weather contingency into the timeline.
Pricing for Home Additions & ADU in Sunset, FL

Here’s what additions and ADUs typically run in Sunset, and what moves the number. Each figure is an estimate; the written estimate you receive sets the final price.
| Project Type | Typical Estimated Range |
|---|---|
| Home Addition | $45,000 – $130,000 |
| ADU Construction | $90,000 – $220,000 |
| Garage Conversion | $30,000 – $80,000 |
What moves the price in Sunset specifically: the septic and well survey and any setback redesign, the length of the material haul and how much equipment access the lot allows, and grading and drainage on an open lot. Those are the line items a quote can miss if the contractor hasn’t worked a tight, built-out county lot. We put them in writing up front. Call (844) 797-9523 to schedule your free estimate – it’s free, and a line-item written quote comes back to you.
We Also Serve Cities Near Sunset
Sunset projects don’t stop at the line. We also work with homeowners in Olympia Heights, Westchester, Westwood Lakes, and Kendall, where the lots and the county permitting rules are close cousins to what you’ll find in Sunset. If you’re planning an addition just over the boundary, the same scoping process applies. Bring your plans and we’ll walk the site through permitting and cost.
Serving Sunset, FL – Our Local Coverage Area
We serve Sunset and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
FAQs – Home Additions & ADU in Sunset

Yes. Sunset is unincorporated Miami-Dade, so a detached ADU is permitted and inspected by the Miami-Dade County Building Department, not a separate Sunset city hall. That includes the impact windows, doors, and roofing assembly, which each need a current Miami-Dade Product Control NOA. Call (844) 797-9523 for a free estimate and we’ll scope the county permitting into the number.
They often set the buildable envelope before the house footprint does. On a typical Sunset lot, the septic tank, drainfield, and well locations decide how far back and where a detached ADU or shop can go, so a plan drawn without a site survey risks a mid-build redesign. We survey the utilities before we fix the envelope. Call (844) 797-9523 to start scoping.
Because a built-out, tight lot makes the delivery and access logistics part of the cost. Long hauls and limited equipment access on a Sunset lot add time and handling, and a quote that prices the structure but not the logistics will move once work starts. We scope both before the estimate is written. Call (844) 797-9523 for a written line-item quote.
A current Miami-Dade Product Control NOA is what stands behind them. Each impact window, exterior door, and roofing assembly used on a Sunset addition must carry the county approval, and we specify brands like PGT, CGI, and ECO Window Systems with that in place before submittal. Out-of-area contractors routinely miss this on the first permit pull. Call (844) 797-9523 to have yours inspected and specified correctly.
It’s priced as its own line item in the initial scope, not added after. An open lot with a new addition needs the runoff planned against the heavy South Florida summer downpours, or the slab and subfloor get reworked later. We estimate the grading before work begins, so the number you see is the number we build to. Call (844) 797-9523 to schedule your free estimate.
Adding square footage in Sunset isn’t a simple flat-lot job. Between county-level Miami-Dade permitting, the NOA product approval on impact openings and roof assemblies, septic and well setbacks that fix the buildable envelope, long material hauls, and open-lot grading, the details decide your price and your timeline. We scope every one of them before you sign. Bring your addition plans, or let us build the case for one, and we’ll walk the site through permitting, materials, and cost together. Call (844) 797-9523 for a free estimate. We answer 24/7, with fast dispatch from 7am to 7pm, Sunday through Friday.